2000 Building of the Stage Bus
Cutting the side


speaker
weight: 120 kg. ,can be lifted to the roof by a cable system and an electro engine recovered at a ship yard


cutting the side. 
In 1999 this bus had stickers on the side with the names of all the cities where performances where held.

taking out the windows.



cutting through steel

the side coming off
2000 Building of the Stage Bus
Making the Stage

suspension repair

re-inforced by steel bars

installing the frame work

electric wiring/
steel cable system

installing cables and canvas support

 

 

    Luluk Purwanto
Helsdingen Music BV copyrighted © 2000. All rights reserved
Email: hmbv@xs4all.nl
Home page